A We can provide PCB design solutions, but customers are required to provide details of the product.
Q How long is the product delivery time?
A
he sample completion time is 3-4 days.
The mass production time for single-sided board is 7-12 days.
Q How to ensure the accuracy and reliability of PCB manufacturing?
A Strictly control every link in the production process, including material inspection, process control, equipment calibration, quality inspection, etc. At the same time, a complete quality management system and traceability mechanism must be established.
Q What certifications do you have?
A Our company has passed ISO9001, ISO14001, IATF16949 certifications; our products have passed CQC, UL, CUL certifications, and our products comply with international standards such as RoHS, REACH, and CE.
Join Our Mailing List
Get The Latest Updates On New Products And Upcoming Sales.
Adam.deng@fsguoli.com/echo.feng@fsguoli.com WeChat: +86-18680025131/+86-13621431781 Address: No11 Dong Qu Three Road Lianhe Industrial Zone Luovillage Shishan Town Nanhai District.Foshan Guang Dong China